Virtual Link light rail RSS

The project to recreate Seattle's Link light rail system as a route for the OpenBVE train simulator by Oran Viriyincy.

Archive

Oct
4th
Sun
permalink

folding back

It’s been a few months since I last worked on the route. I haven’t given up on the project. Due to other commitments, I haven’t had the time. To reduce my overhead, I’ll be posting updates on my main website at http://oran.hoshiru.net once again.

Jul
10th
Fri
permalink
Finally obtained as-built plans of the DSTT retrofit.

Finally obtained as-built plans of the DSTT retrofit.

Jun
20th
Sat
permalink
Is taking on Link too ambitious? How about a fictional route I call the Canal Line.

Is taking on Link too ambitious? How about a fictional route I call the Canal Line.

permalink
[Flash 9 is required to listen to audio.]

It’s becoming more real everyday. It is time to restart construction of this virtual Link Light Rail. Even at this pace, I still believe that I can complete Link faster and cheaper than Sound Transit ;).

May
13th
Wed
permalink

brief hiatus

It’s been really busy at school and work and the project hasn’t been touched in a while. I hope to start it up again as things start to clear up, probably as late as mid-June.

Meanwhile, in the real world, Sound Transit is expanding Link light rail testing along the entire route beginning Monday, May 18. Intensive testing will happen between 6 am to 6 pm from Tukwila International Boulevard station to Stadium station just south of the transit tunnel entrance. Trains will also be tested in the downtown transit tunnel between 9 am and 3 pm. I’ll be down there to check it out.

May
2nd
Sat
permalink
We have a long way to go…

We have a long way to go…

Apr
24th
Fri
permalink

Downtown Seattle Transit Tunnel extension of NB route in progress.

Apr
19th
Sun
permalink
What a rollercoaster ride: believe it or not, Northgate is near the same elevation as Capitol Hill.

What a rollercoaster ride: believe it or not, Northgate is near the same elevation as Capitol Hill.

permalink
Now reached Northgate. Partially implemented speed limits. Total travel time Westlake to Northgate: 16.5 minutes vs ST’s 13 minutes. Must be the poorer ability to climb grades of the heavy 6-car Tube trains compared with the lighter Kinkisharyo LRVs.

Now reached Northgate. Partially implemented speed limits. Total travel time Westlake to Northgate: 16.5 minutes vs ST’s 13 minutes. Must be the poorer ability to climb grades of the heavy 6-car Tube trains compared with the lighter Kinkisharyo LRVs.

permalink

On spiral and circular curves

As you can see the curves don’t seem to be accurate enough compared with the real map. I have to brush up on my surveying knowledge on staking out curves and attempt to recreate those nice spiral curves.